Bengaluru Metro Pink Line Opens to the Public Today
The 7.5-km elevated Pink Line section from Kalena Agrahara to Tavarekere, inaugurated by PM Modi on 13 November, begins passenger services at 6 am on Saturday, 14 November 2026.
Bengaluru's Namma Metro Pink Line opens to the public today, Saturday, 14 November 2026. The 7.5-km elevated section from Kalena Agrahara to Tavarekere, with six stations along Bannerghatta Road, was inaugurated by Prime Minister Narendra Modi on Friday. Passenger services begin at 6 am, and the opening takes the city's operational metro network past the 100-km mark to 103.6 km.
Opening day on Bannerghatta Road
Bengaluru's Namma Metro Pink Line's 7.5-km elevated stretch was flagged off by Prime Minister Narendra Modi at 12.45 pm on Friday, 13 November. The stretch opens to the public at 6 am on Saturday, 14 November, offering commuters along Bannerghatta Road a new public transport option.
The section, built at an estimated cost of about 3,470 crore rupees, runs from Kalena Agrahara to SG Palya, formerly Tavarekere. With the addition of the new stretch, Bengaluru's operational metro network expands from 96.1 km to 103.6 km. During the inauguration, Modi bought a ticket at the SG Palya station counter and rode the train with Chief Minister DK Shivakumar.
The six stations
The elevated section covers six stations: Kalena Agrahara, Hulimavu, Bilekahalli-IIMB, NS Palya-JP Nagar 4th Phase, Jayadeva Hospital and SG Palya. Three stations on the section were renamed by the Centre this week: IIMB is now Bilekahalli-IIMB, JP Nagar 4th Phase is NS Palya-JP Nagar 4th Phase, and Tavarekere is SG Palya.
Jayadeva Hospital is an interchange station, where passengers can switch to the Yellow Line, which connects areas such as Electronic City, HSR Layout and Jayanagar. The opening is expected to improve metro connectivity for commuters travelling through south Bengaluru, particularly those living and working around Hulimavu, JP Nagar and the IIM Bengaluru area.
Fares, frequency and tickets
During peak hours, trains are expected to run at intervals of eight minutes. The elevated section will initially operate with five BEML-built trains, of which four will be in service and one will remain on standby. The Pink Line will be the first corridor in Bengaluru's Namma Metro network to introduce platform screen doors, which separate passengers from the tracks and improve platform safety.
Fares on the newly opened stretch have been reported at between 10 and 30 rupees, depending on the distance travelled, but the Bangalore Metro Rail Corporation Limited (BMRCL) had not officially notified fares at the time of reporting, so commuters should check official announcements. Tickets can be bought through QR codes, the Namma Metro app, smart cards, National Common Mobility Cards, or BMRCL's WhatsApp ticket booking.
What is still to come
The elevated section is only the first part of the 21.25-km Pink Line, also known as Line 4, which will eventually connect Kalena Agrahara in south Bengaluru with Nagawara in the north, with 18 stations in total. The remaining 13.75-km underground section from Dairy Circle to Nagawara is still under construction.
Reports differ on when the underground section will open, with some putting it at March 2027 and others at May 2027, so no firm date should be assumed. To help commuters reach the new stations, BMTC is planning five additional feeder bus services using 30 buses and around 415 trips every day.
Editorial disclosure
This article was researched with AI assistance and reviewed by the publisher before publication. Report factual errors through our contact page.
Frequently asked questions
When does the Bengaluru Metro Pink Line open to the public?
Passenger services on the 7.5-km elevated section from Kalena Agrahara to Tavarekere begin at 6 am on Saturday, 14 November 2026, a day after Prime Minister Narendra Modi inaugurated the stretch.
Which stations are on the newly opened Pink Line section?
Six stations: Kalena Agrahara, Hulimavu, Bilekahalli-IIMB, NS Palya-JP Nagar 4th Phase, Jayadeva Hospital and SG Palya (formerly Tavarekere). Jayadeva Hospital connects with the Yellow Line.
What are the fares and how often will trains run?
Fares have been reported at 10 to 30 rupees depending on distance, but BMRCL had not officially notified them at the time of reporting. Trains are expected every eight minutes at peak hours, with four trains in service and one on standby.